» Construction » Household building »Bath from plastic bottles

Bath from plastic bottles

Bath from plastic bottles

Each owner of a garden plot wants to have a place on the plot where you can relax, wash away the dirt accumulated during the day, and steal your body well. This place is called a bathhouse. Some owners of garden plots are prevented from building a bathhouse by the high price of building material. Some fear of hard work.

Attention garden owners are invited construction baths from cheap but very durable material - from plastic bottles with a capacity of 2 liters of beer. Plastic is practically not rotten, closed with a cork and filled with air, it can withstand loads of up to 100 kg. In addition, the cost of this material is zero. It is in large numbers everywhere around the garden plots.

The construction of this very durable, and, moreover, environmentally friendly material has not yet been widely used because of some shyness or fear of using unfamiliar building material.

Construction of the bath from plastic bottles begins in the usual manner. Digging a trench under the foundation. The foundation is made lightweight, since the weight of the building material is small. This also saves material resources. Two layers of roofing material are installed on the foundation - waterproofing. A base of 3-4 rows of red brick is laid out on it.

The basement is lined with prefabricated plastic bottles. Bottles in the walls are laid just like bricks on a cement mortar. It is not necessary to install waterproofing between the base and the walls; plastic bottles are not subject to decay. An important point, during the construction of the walls, between 2 and 3 rows of bottles from the bottom, in the middle and between 2 and 3 next to the top, boards of 50 by 150 millimeters are laid. This is necessary in order to fix the lining of the internal walls.

At the end of the construction of the walls, one wreath of wooden timber is installed at the top, which is needed to install the roof and ceiling of the bath. The last moment, before equipping the bath, the walls of the bath are plastered and left to harden for 6 months.

While waiting, the walls harden, lay the floor in the baths, you can make partitions. During this period, you can not load the walls. The roof and ceiling are installed after the walls harden.

After installing the roof and ceiling, they are engaged in interior decoration of the bath. To reduce the effect of high temperature, the walls of the bath are sheathed with floor dowel boards. Lining will not work, because it is very thin. The boiler and the steam room itself are sheathed with insulating material. A washing section and a dressing room are equipped.

So, the bath is ready.
4
4
4.3

Add a comment

    • smilesmilesxaxaokdontknowyahoonea
      bossscratchfoolyesyes-yesaggressivesecret
      sorrydancedance2dance3pardonhelpdrinks
      stopfriendsgoodgoodgoodwhistleswoontongue
      smokeclappingcraydeclarederisivedon-t_mentiondownload
      heatirefullaugh1mdameetingmoskingnegative
      not_ipopcornpunishreadscarescaressearch
      tauntthank_youthisto_clueumnikacuteagree
      badbeeeblack_eyeblum3blushboastboredom
      censoredpleasantrysecret2threatenvictoryyusun_bespectacled
      shokrespektlolprevedwelcomekrutoyya_za
      ya_dobryihelperne_huliganne_othodifludbanclose
1 a comment
And it’s not a pity to spend so much time)

We advise you to read:

Hand it for the smartphone ...