The area around the house (3x5 m) disappeared (according to use). It rains in summer and snow in winter. So the idea arose to make a canopy over this site. But it’s hard for one to make a heavy construction. Therefore, I chose a light profile pipe 20x20. And to enhance the rigidity of the canopy for farms 15x15. It is easy to bend a profile pipe 20x20. Pillars of water pipes are tied together on top and bottom. The canopy welded on the site was lifted with one sheaf on poles. Polycarbonate pushed from below on a canopy. He laid boards and, standing on them, drilled and fixed. Safety net is a rope through the roof. Farm after 1 m. That's what happened.

Question \ topic is automatically published in the social. site network - stay tuned for answers there:

Suitable for topic

Related topics

Add a comment

    • smilesmilesxaxaokdontknowyahoonea
      bossscratchfoolyesyes-yesaggressivesecret
      sorrydancedance2dance3pardonhelpdrinks
      stopfriendsgoodgoodgoodwhistleswoontongue
      smokeclappingcraydeclarederisivedon-t_mentiondownload
      heatirefullaugh1mdameetingmoskingnegative
      not_ipopcornpunishreadscarescaressearch
      tauntthank_youthisto_clueumnikacuteagree
      badbeeeblack_eyeblum3blushboastboredom
      censoredpleasantrysecret2threatenvictoryyusun_bespectacled
      shokrespektlolprevedwelcomekrutoyya_za
      ya_dobryihelperne_huliganne_othodifludbanclose
8 comments
Author
general form
Author
frame reinforcement, additional functions


Author
Correction of errors, strengthening the carcass of the canopy, the use of the design for additional functions
Author
Report after three winters:
1. Frame, truss in original condition
2. Polycarbonate 4mm, after leaving the roof of the ice house, cracks appeared on the combs.
3. CONCLUSION: the distance between the farms of 1 meter should be reduced to 50-60 centimeters.
Author
Thanks! I was just interested in corrosion protection.
Author
Quote: Ivan_Pokhmelev
And how did you make the foundation? Is the bottom horizontal pipe just lying on the ground?

Where the site is in contact with the curb, I put a corner.Drive in rebar after 1 m and welded to the corner. Racks welded to the corner. Along the house, similarly, only the reinforcement was driven through the drilled holes in the blind area. fastened the side cross members at a height of 15 cm from the surface of the site, so that there is no contact with the tile, the profile pipe is 1-2 mm thick (quickly rusts)
And how did you make the foundation? Is the bottom horizontal pipe just lying on the ground?